Dissemination and Project Results

cimne flexicast 7th-framework-programme

International Center for Numerical Methods
in Engineering


Robust and FLEXible CAST Iron Manufacturing

Innovative Technologies for Casting,
Material Removing and Forming Processes
Collaborative Project

Deliverable Title: Exploitation Plan. Dissemination and training
Work Package: WP8
Deliverable Number: D8.6
Delivery Date: 48month
Deliverable Nature: Dissemination activity report
Dissemination Level:  
Prepared by: M. Chiumenti
Checked by: M. Cervera
Approved by: E. Codina
Date: 30th November 2016


© All rights reserved 2012
This document is supplied under the FLEXICAST contract (reference 7FP-2012-7-NMP-ICT-FoF-314540) on the conditions that those parties identified in the contract treat it as CONFIDENTIAL.